Resources
Free guide

15 conflicts between your specs, drawings and contract

Where each one hides, how to check for it, and the real project where it was caught.

What's inside
  • 15 checks across 4 project stages, from bid to construction
  • Where each conflict hides and who on the team owns it
  • The steps to check it, and what to do when you find it
  • A printable matrix to give every check an owner

By Charles Goulet, Co-founder and CEO, and Vincent Leclerc, Growth Lead

Cover of the free guide: 15 conflicts between your specs, drawings and contract
Get the free guide

28 pages, PDF. The download link appears as soon as you submit.

Your guide is ready.

Download it now, print the matrix on page 4, and give every check an owner.

Download the guide (PDF)

Want to see Telamont run these checks on a full project? Book a 30-minute demo.

Oops! Something went wrong while submitting the form.
A look inside

One page per check, written for the team that runs it.

Check 1: insurance limits raised in another document
Check 1: Insurance limits raised in another document
Check 9: an element the structure never drew
Check 9: An element the structure never drew
The printable cross-check matrix
The printable cross-check matrix
2 checks
Bid
Before you submit your price
5 checks
Award and signing
Before you sign the contract and the subcontracts
5 checks
Before work starts
Once the construction set is issued
3 checks
During construction
While the project runs
Get the free guide