Prioritise, assign and follow every risk through to closure.

Chantier de construction avec grues
Risk prioritisation

Handle every risk in the order of its impact on the project.

Un risque de triage et la clause du contrat qui l'a déclenché, à la page 12 sur 116A triage risk and the contract clause that triggered it, on page 12 of 116
From detection to notice

Handle hundreds of risks with one method, and keep a defensible record of every decision.

A project can carry hundreds of open risks at once. Triage ranks them by what they cost in money and in days, so you know which one to start with.
Dismissing a risk is a decision, not an oversight. Each one keeps its author, its date and the clause invoked, enough to defend your choices eighteen months later.
A risk you keep is never retyped elsewhere. It moves to notice drafting or to tracking with its clause and its history, and nothing is lost in between.
Complete shared record

Move from detection to notice without losing a risk, a date or a clause.

[01]

Risk detection
It spots the gaps between your documents and cites each one to its clause. That is what feeds the queue.

[02]

Notice generation
It drafts the notice from the risk and the clause that requires it, with no retyping.

[03]

Tracking
It carries every risk you keep through to closure, with its owner and its due date.
Take action

Take control of your project risks

Book a demo