Risk detection
Find contradictions across the contract, the specs and the drawings.
↳ Telamont reads them together, catches what does not line up, and cites every gap to the exact article, while it can still be settled with an email.


A detector for every type of risk.
Technical risks
Reads drawings and technical specifications, and surfaces inconsistencies between disciplines: space conflicts, dimensions that do not match, a detail missing from a section.
Contractual risks
Cross-checks contracts against subcontracts: contradictions, order of precedence, notice periods, exclusions and limits of liability.
Compliance risks
Checks documents against the applicable building code, the standards it references, local amendments and your master specifications.
Schedule risks
Cross-checks the schedule against contractual obligations: milestones, delay penalties, imposed sequences.

Proactive analysis
The work nobody priced and the clauses that contradict each other, caught before it gets expensive.
Back charges may be deducted without prior notice
Amounts can be set off against your next progress claim before you see them.
Investigate
Add to Operations
A claim is waived if notice is late by a single day
Ten working days from the event, not from the day the cost becomes knowable.
Investigate
Add to Operations
Consultant review time is excluded from extension of time claims
Standard on CCDC 2 and already priced into your programme: worth confirming, not chasing.
Investigate
Archive
Accepting a substitution transfers all redesign cost to you
The substitution is approved, the coordination and resubmittal work is not priced.
Investigate
Add to Operations
Liquidated damages accrue for every day of delay, with no ceiling
Every calendar day between the contract completion date and substantial performance is deducted, without limit as to amount.
Investigate
Add to Operations
Hot work cannot start before the fire safety plan is accepted
Approval sits with the authority having jurisdiction and the schedule holds no float for it.
Investigate
Add to Operations
Payment suspended until the owner pays, with no backstop
Sixty days of exposure, and nothing owed if the owner never pays at all.
Investigate
Add to Operations
No risk found
Find the problem while it can still be settled with a conversation.
A contradiction caught at tender is fixed by email. The same contradiction six months later is settled as a claim.
73 %
less risk of ending up in a claim
80 %
of risks flagged earlier, before execution
160
monetisable risks found on a $25M project (55 to 160 depending on the project)
No notice deadline missed on the project
A defensible position, clause in hand
Critical risks handled first

How it works
Three steps to find the risks across the project.
Choose the risk families
Technical, contractual, compliance. You tick the families that matter on this project, not the others.
Upload the project documents
Contracts, subcontracts, technical specifications, drawings. The engine reads them together, not one by one.
Run the detection
Findings land in triage, sorted by severity, each cited to its clause.

.png)

