Design professionals

Catch the contradictions between your drawings and specs before the tender.

↳ Telamont reads your specifications, your drawings and the other disciplines' documents together, finds what contradicts, and cites the exact article. You fix it while it still costs a revision.
Chantier de construction en ville, en fin de journée
Your risk

Your documents become the contractual reference for the project. Whatever contradicts between the specifications and the drawings gets settled on site, under pressure, and the question of liability comes back to you.

Telamont compares the specifications, the drawings and each discipline's documents, and shows what contradicts from one document to the next. Every gap is cited to its article.
Meanwhile the RFIs pile up. A contradiction left in the documents comes back as a site instruction, then as a change order.
Fewer addenda to issue
Fewer RFIs
Fewer change orders

Common risks

Contradictions that come back on site, project after project

[01]

A specification requirement that appears on no drawing.

[02]

An addendum that changes a section without fixing the cross-references.

[03]

A structural drawing that contradicts the architectural drawing.

[04]

A standard cited in an edition that is no longer in force.

[05]

A precedence clause that reverses the order of the documents.

[06]

An RFI response that contradicts the specifications.