General contractors

Find, prioritise and settle every risk before it gets expensive.

↳ Telamont reads your contract, your subcontracts, your specifications and your drawings together, finds what is missing and what contradicts, and cites the exact article. You settle the problem while it still costs a conversation.
Your risk

You are answerable for clauses you did not write. What the owner puts on you has to reach your subcontracts, and whatever does not reach them, you carry alone.

Telamont compares the prime contract against every subcontract and shows what is missing downstream. Gaps between the specifications, the drawings and the codes are cited to their article.
Meanwhile the notice deadlines are running. A late notice does not weaken your claim: it bars it.
Institutional through industrial
Any delivery method
No legal department needed
Telamont interface: risk detection across project documents
Risk by the numbers
$60.1M

Average North American construction dispute.

$1.4M

Rework avoided on one project, after a code conflict was caught before execution.

The same reading of the contract for the whole team

Project manager
Knows what the contract requires without reading 400 pages, and can prove it at the next site meeting.
Estimator
Sees the gaps between the specifications and the drawings before the price goes out, not after the change order.
Superintendent
Receives the answer cited to the article, without having to call the office.
Management
One standard of contractual control across every project, instead of one per project manager.

An AI assistant knows the world. Telamont knows your project.

Your drawings read with your specs
Telamont cross-reads the specification text and the drawing, then cites the exact element on the sheet where the gap appears. The contradiction shows up before the price goes out.
Every answer cited to its article
Every finding opens to the exact page of the source document, and the notice goes out with its citation attached. Your position is backed in writing, not from memory.
Your company's memory
What one project manager finds today resurfaces on the next similar project, for the whole team. Your experience accumulates instead of starting over.
Integrations

Your tools stay your tools.

Telamont connects to the systems where your documents already live, and sends its alerts to where your team already works..

Common risks

Gaps that eat into the margin, project after project

[01]

An owner requirement that never flowed down into any subcontract.

[02]

A notice deadline in the prime contract shorter than the one you impose on your subcontractors.

[03]

A specification that contradicts the drawings, priced by no one.

[04]

Construction drawings that no longer say what the bid drawings said.

[05]

A precedence clause that reverses the order of the documents.

[06]

A code requirement the specifications never carried, and nobody priced.

Take action

Take control of your project risks

Book a demo