This page was made for your team.
Share it with a colleague
Telamont
Zignego Company, Inc.

We found 6 risks in the Janesville Big Foot IH 43 to CTH K bid documents.

Each one could be worth a question to WisDOT before bids close on December 8, 2026. Here are 3, with the clause and page.
Janesville Big Foot IH 43 to CTH K
What we found in the
Janesville Big Foot IH 43 to CTH K
documents
Finding

Small pipe culvert 64014036124 is called out as a 29x45-inch pipe on one plan sheet and a 36-inch pipe on another

The plans call out the three CPRC Class III pipes at small pipe culvert 64014036124 as 29x45-inch on page 417 and as 36-inch on page 421. A bid priced on one pipe size can be held to the other. Which size governs is worth settling with WisDOT before bids close.

Plans, culvert sheets (pp. 417 and 421)
Finding

Dewatering in areas of known contamination, with testing, holding and disposal of the water, is incidental to the pay item

The special provisions say groundwater from excavations in contaminated areas may need analytical testing, a holding tank or tanker truck, and a licensed hazardous waste hauler, and that these dewatering costs are incidental to the pay item. The provision gives no expected volume of water or pumping duration, so the cost cannot be fixed from the bid set. A question to WisDOT about the expected volume would give every bidder the same basis.

Proposal, special provisions (p. 43)
Finding

The existing pavement structure on Sweet Road and Sharon Street is assumed, with no as-built information

The existing typical sections for Sweet Road and Sharon Street state that there is no as-built information and that the pavement structure is assumed. Removal, base treatment and tie-in quantities depend on what is actually under the surface. Asking WisDOT for any coring or record information before bids close would give every bidder the same basis.

Plans, existing typical sections (p. 9)
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The Janesville Big Foot IH 43 to CTH K project is out for bids until December 8, 2026, with the plans and the proposal public on the WisDOT site. We ran Telamont on that public package to see what bidders will be working with. A few points are worth raising with WisDOT before bids close, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo