This page was made for your team.
Share it with a colleague
Telamont
Veterans Electric

We found 8 risks in your North Campus Feeders documents.

Here are 3 of the 8 risks we found in the public North Campus Feeders package, each with the clause and page it comes from.
North Campus Feeders
What we found in the
North Campus Feeders
documents
Finding

Fire watch starts after 8 hours of fire protection impairment in the Special Notes and after 4 hours in the Safety Requirements

Special Notes, Article 3.46, ask for a fire watch when sprinkler or fire and smoke detector systems are out of service for more than eight hours. The Safety Requirements ask for one for impairments of more than 4 hours in a 24-hour period. Staffing and cost depend on which threshold the VA enforces.

Special Notes, Article 3.46, p. 48, and Safety Requirements, p. 116
Finding

Firestopping is Hilti only in the Special Notes and Hilti or equal in Section 07 84 00

The Special Notes state that Hilti Firestop products are the only approved firestop penetration products at the VAMC, while Section 07 84 00 allows Hilti or an equal product. Pricing and submittals follow the narrower requirement unless the VA confirms which one applies.

Special Notes, Article 3.32, p. 44, and Section 07 84 00, p. 303
Finding

Grounding electrodes must reach 5 ohms with whatever additional rods it takes, at no additional cost

Section 26 05 26 requires the rods shown on the drawings plus any modification or addition to the grounding electrode system needed to keep resistance to ground at or below 5 ohms, without additional cost. The number of rods, added conductors, excavation and testing-driven additions cannot be priced from the package.

Specifications, Section 26 05 26, p. 386
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The north campus feeder upgrade at Zablocki moves a live hospital to a new loop feed, and the package behind it is a full statement of work, a specification book and four drawing parts. We ran Telamont on the public documents to see what your crew will be working with as the job moves forward. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo