We found 12 risks in your Chillicothe water system documents.

Here are 3 of the 12 risks we found in the public Chillicothe water system package, each with the clause and page it comes from.
Chillicothe water system
What we found in the
Chillicothe water system
documents
Finding

Existing building automation network: no documented capacity for 16 monitoring stations

Sheet 00-P002 requires five new water quality monitoring stations to connect to the campus building automation system over the existing DDC network, alongside eleven existing stations, and makes the contractor responsible for identifying every integration point. No spare ports, controller capacity or network loading is given.

Drawings, sheet 00-P002, p. 8
Finding

Existing electrical panels: ratings and spare capacity are not documented

Sheet 00-P001 requires new plumbing equipment to be connected to existing panels and leaves the survey of available circuits and capacity to the contractor. Without ratings or spare capacity in the documents, breakers, feeders and panel changes cannot be priced.

Drawings, sheet 00-P001, p. 7
Finding

Infection-control risk classes are still TBD, yet the required controls depend on them

Section 01 35 26 ties the required barriers, negative-air equipment and sequencing to the ICRA class of each work area, and some areas, such as the fiber loop, are listed as class TBD. Class III or higher needs a permit before work starts.

Specifications, Section 01 35 26, p. 69 to 82
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

Book a 30-minute demo on the Chillicothe water system package. It is already set up, so there is nothing to prepare: we go through every risk with the page it comes from, and the ones worth raising with the VA now.

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Congratulations on the Chillicothe water system award. Before your crews start on the domestic water lines, we ran Telamont on the public solicitation package to see what your team will be working with. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo