This page was made for your team.
Share it with a colleague
Telamont
Vannoy Construction

We found 7 risks in your Cub Creek Bridge documents.

Here are 3 of the 7 risks we found in the public Cub Creek Bridge package, each with the clause and page it comes from.
Cub Creek Bridge
What we found in the
Cub Creek Bridge
documents
Finding

The 12-inch water line is scheduled as PVC SDR 21, while the utility notes call for ductile iron Class 350 or PVC C-900 DR-18

The utility construction notes require the 12-inch water line in ductile iron pipe Class 350 or PVC C-900 DR-18. The water line profile on sheet UC-006 lists 309 LF of 12-inch PVC SDR 21 water pipe, which is not either of those. The pipe that is priced and ordered from the profile would not meet the note.

Utility construction plans, NCDOT C205214, p. 3 and p. 9 of 10
Finding

Form SPA-1 is due within 14 days of the notice of award, or every steel price adjustment is lost for the life of the contract

The steel price provision requires the completed Form SPA-1 within 14 calendar days after the notice of award, in the same submittal as the bonds and the execution sheets. If it is missing from that submittal, no item in the contract is eligible for a steel price adjustment.

Project Proposal, NCDOT C205214, G-11, p. 15 of 346
Finding

All work and traffic on the new structure must be in place by August 15, 2028, at 2,000 USD per day with no maximum

Intermediate Contract Time Number 1 requires all work in the contract, with traffic in place, by August 15, 2028, ahead of the February 11, 2029 final completion date. Work in jurisdictional waters waits for a meeting with the regulators, so permit timing sits inside a clock that costs 2,000 USD per calendar day.

Project Proposal, NCDOT C205214, G-6, p. 10 of 346
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The Cub Creek bridge on Oakwoods Road brings structure, utility, permit and traffic plans together in one package. We ran Telamont on the public NCDOT documents to see what your team will be working with. A few items are worth raising with NCDOT early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo