This page was made for your team.
Share it with a colleague
Telamont
Thompson Arthur

We found 16 risks in your Pineview Street documents.

Here are 3 of the 16 risks we found in the public Pineview Street package, each with the clause and page it comes from.
Pineview Street
What we found in the
Pineview Street
documents
Finding

Failed bores and grade corrections on the utility crossings carry no separate payment

Sheet UC-3B says grade adjustments made to compensate for an invert elevation variance are constructed at no additional cost to the Owner, and that there is no separate payment for unsuccessful bores. Each bore that misses its invert or fails is absorbed in the bid price, with no pay item and no limit.

Utility Construction Plans, NCDOT C204990, sheet UC-3B, p. 5 of 14
Finding

A failing homemade junction box and a sink hole are noted for plug and fill, with no depth or extent given

A roadway plan sheet notes a 4-foot round homemade junction box to be plugged and filled with flowable fill, next to a sink hole. The sheet gives no depth for the box and no extent for the sink hole, so the flowable fill volume, excavation and access cannot be sized before work starts.

Roadway Plans, NCDOT C204990, p. 21 of 25
Finding

The railroad can stop all operations after a measured movement and decide the corrective action, which is charged to project expense

If the Railroad Engineer determines that movement has occurred, Norfolk Southern can immediately require all contractor operations to cease and decide the corrective action. The provision puts that action, including the monitoring of it, at project expense without saying who carries that expense under the contract, which is worth confirming with NCDOT before work near the railroad starts.

Project Proposal, NCDOT C204990, Norfolk Southern Special Provisions RR-12, p. 217 of 290
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Pineview Street brings roadway, signal, utility and culvert plans together in one package. We ran Telamont on the public NCDOT package to see what your team is working with. A few points are worth settling with NCDOT while the work is still early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo