This page was made for your team.
Share it with a colleague
Telamont
Southwind Construction

We found 25 risks in your AIWW FY27 documents.

Here are 3 of the 25 risks we found in the public AIWW FY27 package, each with the clause and page it comes from.
AIWW FY27
What we found in the
AIWW FY27
documents
Finding

The clearing section bans burning and then allows it

Section 31 11 00.10 says the contractor shall not clear by burning, and a paragraph added by Amendment 0002 lets the contractor burn cleared vegetation inside the diked placement area with a burning permit. Clearing is a lump-sum item, so hauling to a landfill or burning under a permit sits inside the price, and the documents do not say which one governs.

Amendment 0002 package, Section 31 11 00.10, pp. 26 to 27
Finding

The damaged spillway must be protected and dewatered, with no size or extent given

The specification says the existing spillway at the Mile Hammock Bay placement area is damaged and cannot be used, and sheet CN109 requires its protection, dewatering and later removal of the protection. The sheet gives approximate coordinates only: no dimensions, material or extent of damage, so the protection and dewatering effort cannot be sized from the documents.

Specifications, Section 35 20 23.10 38, p. 327 · Sheet CN109
Finding

Onslow Beach has a work window ending March 31 and another ending April 30

Section 01 57 19 allows dredging on Onslow Beach from November 16 to April 30, while the permit table in the same specifications closes Onslow Beach on March 31. Which date governs decides whether the crew has an extra month on that beach.

Specifications, Section 01 57 19, p. 156 · Permit table, p. 173
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Congratulations on the FY27 Intracoastal Waterway award. We ran Telamont on the public package to see what your team will be working with. A few items are worth settling with the Corps early, and I would be glad to walk you through them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo