Sheet 185 General Note 1 requires the existing electrical service and associated conductors to remain. The #28 callout requires removal of the 060 service and installation of the 070 service.
The structural design table sets the foundation top and tip at 394 FT and 375 FT. The section sets the drill shaft top and bottom at 397.00 FT and 380.00 FT. The same kind of gap appears on several other dynamic message sign foundations.
Sheet 75 marks an existing conduit run for preparation and assigns new Ethernet and single-mode fiber work to the same chart. The documents give no size, fill or condition for the concealed run.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the IH 45 Innovative Corridor award in Dallas County. We ran Telamont on the public TxDOT plans and proposal to see what your team will be working with. A few points are worth settling with the Dallas District early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

