We found 44 risks in the MMAC wastewater plant bid documents.

Each one could be worth a question to the FAA before bids close on November 30, 2026. Here are 3, with the clause and page.
MMAC wastewater plant
What we found in the
MMAC wastewater plant
documents
Finding

The window glass has a laminated inner lite in Section 08 51 13 and an annealed inner lite in the Section 08 80 00 schedule

Section 08 51 13 requires the impact-resistant insulating glass unit to use a clear laminated interior lite. The Section 08 80 00 schedule lists the G-1 indoor lite as clear annealed float glass. A bid priced on one construction can be held to the other, and laminated is the costlier one. Which governs is worth settling with the FAA before bids close.

Specifications, Section 08 51 13 (p. 192) and Section 08 80 00 (p. 233)
Finding

The footings and piers are preliminary, with final sizes issued after the metal building information is received

Sheet S-101 marks the footings and piers as preliminary and for bidding only. Final sizes follow the metal building information, so the excavation, concrete, reinforcement and forming quantities cannot be fixed from the bid set. Asking the FAA when final sizes will be issued is worth doing before bids close.

Drawings, Sheet S-101 (p. 35)
Finding

Unstable subgrade must be overexcavated and replaced, and the geotechnical report gives no amount

The geotechnical report says unstable soils should be overexcavated and replaced with an approved low volume change soil, and that the amount cannot be determined at this time. The excavation, disposal, replacement fill and compaction have no quantity to price. A question to the FAA about an allowance or a unit price would give every bidder the same basis.

Geotechnical report (p. 108)
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The MMAC Industrial Waste Water Treatment Plant Upgrades are out for bids until November 30, 2026, with 15 public documents between the specifications, drawings and geotechnical report. We ran Telamont on that public package to see what bidders will be working with. A few points are worth raising with the FAA before bids close, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo