Sheet GC-101 allows no more than two telecom rooms down at a time, while GI-004 allows three. The owner's RFI answer says both are correct depending on the baseline schedule you develop, so the cutover sequence and outage crews cannot be planned around one limit until it is clarified.
The security drawings and specifications require every component needed for a complete, fully functional system, and say supporting equipment may not be described in the documents. Hardware, software, programming and back-end equipment that are not listed fall into your price.
The access control requirements send intrusion detection, security access detection and electronic personal protection work to Sections 28 16 11, 28 13 53 and 28 26 00. Those sections are not carried by the specifications, so the interface wiring, programming and testing scope cannot be priced from the documents.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the VA Asheville EHRM award. Before your crews mobilize, we ran Telamont on the public package to see what your team will be working with. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.