The aerially deposited lead report sets the Type R2 soluble lead limit (DI-WET) below 150 mg/L in its handling table and below 1.5 mg/L in its soil-type definitions. Which soil qualifies for reuse under pavement depends on the value, and the two differ by a factor of 100.
The Materials Report recommends a PG 64-28M binder for HMA-A at 0.25 feet or thicker, while section 39-2.02B(3) of the special provisions requires PG 64-10 for Type A HMA. A mix ordered to the report would not match the specification at acceptance.
The bid schedule carries 5,770 cubic yards of contaminated soil excavation. The special provisions say any extra sampling and analysis a disposal facility requires is not paid, and no quantity or allowance is given for it.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the SR-55 and SR-91 award. We ran Telamont on the public package to see what your team will be working with. A few items are worth settling with Caltrans early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.