Sheet CS104 lists a 32-foot single cantilever sliding manual gate (detail A1/CS510), while Section 32 31 13.53, article 2.1.7, requires electric gate operators for sliding gates. Pricing from the drawing leaves the operators out.
Keynote 1 on sheet A-103B calls for 2-inch standing seam hot-dipped steel roofing with a high-performance coating, while Section 07 61 15.00 20, article 2.1.1, requires 3004 aluminum roofing panels (ASTM B209). The material and finish differ, so the roofing order depends on which one governs.
Detail B1 on sheet B-501 shows a 24-inch minimum platform of No. 57 stone with 1 layer of geogrid. Section 31 62 60.00 22 requires a minimum of 3 feet of crushed stone with at least three layers of geogrid spaced at 9 inches. Pricing the detail leaves out stone and two geogrid layers that the specification requires.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the P171 award. Before your crews break ground on the magazines, we ran Telamont on the public solicitation package to see what your team will be working with. A few items are worth settling with NAVFAC early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

