
The proposal's Item 684 note requires 18 AWG Type C signal cable for loop detector lead-ins. The loop detector detail requires two-conductor 14 AWG shielded Type XHHW loop home-run cable.
Pedestal Pole Assembly sheet 530A requires five- or seven-conductor IMSA cables, with multiple cables when more than seven conductors are needed. The traffic signal summary shows Cable 3 as 12-conductor.
The ITS layout requires the contractor to intercept an existing conduit and tie into an existing ground box. The documents describe neither its size, material, spare capacity nor condition.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the IH 30 at Bass Pro Drive award. We ran Telamont on the public TxDOT plans and proposal to see what your team will be working with on the interchange. A few points are worth settling with TxDOT before they cost working days, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

