This page was made for your team.
Share it with a colleague
Telamont
Promethean General Contractors

We found 16 risks in your CDF-22 degrading documents.

Here are 3 of the 16 risks we found in the public CDF-22 degrading package, each with the clause and page it comes from.
CDF-22 degrading
What we found in the
CDF-22 degrading
documents
Finding

The existing spillbox must be moved about 150 feet, with no dimensions, weight or condition in the documents

Section 31 23 00.00 20, paragraph 3.6, requires the contractor to remove the existing spill box and place it in its entirety about 150 feet from the rock dike, and sheet C-101 marks it only as an existing spillbox. The Corps answered a bidder question by saying the bid is based on field observed conditions, so lifting, handling and transport rest on a site visit alone.

Solicitation W912P826BA068, Section 31 23 00.00 20, p. 319 · Plans, sheet C-101, p. 4
Finding

Work starts within 10 days of the notice to proceed, and the Accident Prevention Plan is due 15 days before the start

Section 00 73 00 requires work to start within 10 calendar days after the notice to proceed, while Section 01 35 26 requires the Accident Prevention Plan to be accepted at least 15 calendar days before the start, after the notice to proceed. The plan deadline falls before the notice, so the start date depends on which clause governs.

Solicitation W912P826BA068, Section 00 73 00, p. 97 · Section 01 35 26, p. 192
Finding

The contractor provides boat transportation to the Government inspector on request, with no trips or hours stated

Section 01 10 00, article 21, requires the contractor to furnish, on the request of the Contracting Officer or any inspector, suitable boat transportation from a shore location chosen by the Contracting Officer to and from the project area. The number of trips, the hours and the boat and operator needed are not stated.

Solicitation W912P826BA068, Section 01 10 00, article 21, p. 125
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Congratulations on the CDF-22 degrading award. Before your crews get deep into the excavation on the Calcasieu Ship Channel, we ran Telamont on the public package to see what your team will be working with. A few items are worth settling with the New Orleans District early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo