We found 27 risks in your SOR Waterline documents.

Here are 3 of the 27 risks we found in the public SOR Waterline package, each with the clause and page it comes from.
SOR Waterline
What we found in the
SOR Waterline
documents
Finding

Cathodic protection is left open to galvanic or impressed-current, then required to be an automatically controlled ICCP system

The Basis of Design lets the site evaluation choose between a galvanic and an impressed-current system, then requires an automatically controlled ICCP system built to AWWA D104. The anode and rectifier configuration, and the controls that go with it, depend on which statement governs.

Basis of Design, p. 41
Finding

Backflow assemblies sit at different points in two sections of the requirements

The Backflow Prevention memorandum places one assembly at PS-2 and the other at the tee near the SOR guard house, while the PS-2 tank section puts one at the connection to the existing main and a second on the booster pump discharge. The connecting piping, enclosures and drains depend on which layout governs.

Basis of Design, p. 28 · Bill of materials, p. 87 and p. 88
Finding

Four flow sensors are required, but the bill of materials lists two sensors and one solar assembly

The applicable codes require four ultrasonic flow sensors, each with a self-sufficient solar panel and battery system. The bill of materials lists two clamp-on sensors and one dedicated solar unit, so half of the monitoring devices and their power are missing from the list.

Basis of Design, bill of materials, p. 88
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

Book a 30-minute demo on the SOR Waterline package. It is already set up, so there is nothing to prepare: we go through every risk with the page it comes from, and the ones worth raising with the Air Force now.

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The SOR Waterline puts the design and the build of a new high-pressure line in one fixed price at Kirtland. We ran Telamont on the public package to see what your team will be working with. A few items are worth settling with the Air Force early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo