Section 05 12 00 asks for framing sized to the cooling tower load, size and configuration. Schedule M-601 lists air-cooled heat recovery chiller-heaters and no cooling tower. The structural steel scope names equipment the drawings do not show, so the support framing cannot be sized or fabricated.
Section 33 10 00 describes the gate valves as AWWA C509, non-rising stem, resilient seat in article 2.9.A, and as rising-stem, metal-seated gate valves in article 3.2.B.1. One valve product cannot meet both, and the metal-seated, rising-stem type costs more.
The commissioning narrative says the building will be served by the existing electrical switchgear near the new addition, and the electrical drawings tap the existing bus bars for a new 600A automatic transfer switch. No document gives the spare capacity of that switchgear, so feeder or switchgear upgrades cannot be priced.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
The Jackson CLC is a big build for the VA, and it lands next to your other new VA work this fall. We ran Telamont on the public package to see what your team will be working with through 2028. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

