This page was made for your team.
Share it with a colleague
Telamont
Onsite Construction Group

We found 41 risks in your Kansas City Physical Security documents.

Here are 3 of the 41 risks we found in the public Kansas City Physical Security package, each with the clause and page it comes from.
Kansas City Physical Security
What we found in the
Kansas City Physical Security
documents
Finding

Camera VS-CM-1 is 4 MP on the drawings, but the specification caps it at 3.1 MP

Sheet TN600 describes the VS-CM-1 exterior dome camera at 4 MP, while Section 28 23 00 limits its dual video streams to 3.1 MP. The VA confirmed that cameras are contractor-supplied and that TN600 is the basis of design, so the conflict stays with the contractor.

Specifications, Section 28 23 00, p. 171 · Drawings, sheet TN600, p. 23
Finding

Existing PCB equipment must be removed, with no inventory, quantity or location

Article 1.8 of Section 01 00 00 requires capacitors to be taken out of service and handled under EPA and DOT procedures. No transformer or capacitor count, location or test report is in the package, so the abatement and disposal effort is open.

Specifications, Section 01 00 00, article 1.8, p. 20
Finding

Cable handhole size: 24 x 24 in on the schedule, 24 x 36 in on the plan

Sheet TN002 calls for a 24 in by 36 in handhole, while the schedule on sheet TN600 lists PW-HH-1 as 24 in by 24 in. The cable capacity and the product to order depend on the size.

Drawings, sheet TN002, p. 20 · Drawings, sheet TN600, p. 23
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

Book a 30-minute demo on the Kansas City physical security package. It is already set up, so there is nothing to prepare: we go through every risk with the page it comes from, and the ones worth raising with the VA now.

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The physical security work at the Kansas City VA Medical Center puts your crews on fencing, gates, lighting and cameras around an active hospital campus. We ran Telamont on the public solicitation package to see what your team will be working with. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo