The communications specification requires a metered and monitored three-phase 208V, 20A, 5.7kW rack PDU. The technology schedule lists SC-PDU-1 as a basic 100/120V, 24A, 2880VA unit. The product to order depends on which one governs.
The specification requires a 5 kW three-phase 208V, 20A rack-mounted UPS with L21-20 connections. The technology schedule lists SC-UPS-2 as a 3 KVA, 100V to 127V line-interactive unit. The power system to price depends on which one governs.
Part 2, Article 2.1 of the communications cabling specification identifies the horizontal cables as UTP. Sheet 102-TN101 requires all Building 102 horizontal cabling to be overall shielded. One cable construction has to be priced and ordered, and the installed cabling may need to be replaced at acceptance.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
The EHRM upgrade at the Zablocki VA Medical Center touches a dozen buildings in Milwaukee. Before your joint venture's crews start in the first buildings, we ran Telamont on the public package to see what your team will be working with. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.