We found 29 risks in the North Rim and Roaring Springs bid documents.

Each one could be worth a question to the National Park Service before bids close on January 8, 2027. Here are 3, with the clause and page.
North Rim and Roaring Springs
What we found in the
North Rim and Roaring Springs
documents
Finding

Notice to proceed starts a 15-day and 1,095-day clock in the solicitation form and a 10-day and 1,460-day clock in Special Requirement 1

The solicitation form says to begin performance within 15 calendar days and complete within 1,095 calendar days after notice to proceed. Special Requirement 1 says to commence within 10 calendar days and complete not later than 1,460 days after notice to proceed. The two clocks give different start dates and almost a year of difference in completion, so the schedule and the general conditions price depend on which one governs. That is a question for the National Park Service before bids close.

Solicitation 140PP027R0005, SF 1442 item 11 (p. 1 of 3) and Section H, Special Requirement 1 (p. 18 of 75)
Finding

Seismic design uses Site Class D in section 5.4 and Site Classification B in section 5.6 for the Roaring Springs Pumphouse and Cottonwood sites

Section 5.4 of the Inner Canyon geotechnical report takes a 0.23g peak ground acceleration with ASCE 7-22 and Site Class D, while section 5.6 recommends Site Classification B for seismic design at the Roaring Springs Pumphouse and Cottonwood Campground sites. The two classes lead to different seismic loads for the structures and retaining walls. Which one governs is worth settling with the National Park Service before pricing.

Inner Canyon Geotechnical Investigation Report, section 5.4 (p. 19 of 42) and section 5.6 (p. 20 of 42)
Finding

The two directional bores carry about 3,000 LF of 13 3/8-inch casing in the specification and 1,350 feet per bore in the geotechnical summary

Volume A, section 01 27 00 describes the two directionally drilled bores with approximately 160 LF of 20-inch conductor casing and approximately 3,000 LF of 13 3/8-inch surface casing. The geotechnical summary report describes each bore with an 80-foot conductor casing and 1,350 feet of 13 3/8-inch casing. Whether the specification quantity is per bore or for both bores changes the casing to price, so it is worth confirming with the National Park Service.

Volume A (Div 01), section 01 27 00 (p. 10 of 414) and GRCA 318719 Geologic Interpretive Summary Report (p. 9 of 44)
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The North Rim and Roaring Springs rehabilitation program is out for bids until January 8, 2027, with 52 public documents between the specifications, drawings and geotechnical reports. We ran Telamont on that public package to see what bidders will be working with. A few points are worth raising with the National Park Service before bids close, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo