We found 68 risks in your Charleston SPS renovation documents.

Here are 3 of the 68 risks we found in the public Charleston SPS renovation package, each with the clause and page it comes from.
Charleston SPS renovation
What we found in the
Charleston SPS renovation
documents
Finding

Hazardous materials are removed by the Government before the work, and the same section says they are present for demolition

Section 02 41 19 states that hazardous materials will be removed by the Government before the start of the work, and in the same section lists hazardous materials as present in the buildings to be selectively demolished. Section 02 83 33.13 specifies lead abatement for the contractor. Demolition is either cleared by the Government or run as controlled hazardous work, and the two carry very different cost and schedule.

Section 02 41 19, p. 250 · Section 02 83 33.13, p. 257
Finding

Resinous flooring has two moisture limits: 5 lb and 3 lb per 1,000 square feet in 24 hours

The flooring preparation article gives a vapor emission rate of 5 lb of water per 1,000 square feet in 24 hours, and a later line sets the moisture vapor transmission threshold for monolithic resinous flooring at 3 lb. The 3 lb limit is stricter, and a slab that passes at 5 lb can still need moisture control work to pass acceptance.

Flooring preparation article, p. 522
Finding

If the existing valves fail to hold, freezing the pipe is at the contractor's cost, with no allowance

Drawing P-001 makes the contractor responsible for the cost and effort to freeze the pipe if the existing valves fail to hold. The isolation method and its duration depend on valves nobody has tested, and no quantity or change mechanism covers it.

Drawing P-001, p. 125
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The SPS renovation at the Ralph H. Johnson VA has to keep sterile processing running while the new air handler and equipment go in. We ran Telamont on the public package, the statement of work, the specifications and the drawings, to see where they still disagree. A few items are worth settling with the VA early, and I would be glad to walk your team through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo