The construction details call for the first pass of the lower layer in HMA Pavement 4 MT 58-34 V, while the typical sections and the bid item list the lower lift as 4 MT 58-28 S. A bid priced on one mix can be held to the other, and the 58-34 V designation is the more demanding. Which mix governs is worth settling with WisDOT before bids close.
The plans call for filling voids behind the barrel walls, ceiling and separated joints of the existing box culvert at structure C-61-8310. Neither the plans nor the proposal states the number, size or depth of the voids, so the fill material, preparation and labor cannot be fixed from the bid set. Asking WisDOT for an estimated quantity or an allowance before bids close would give every bidder the same basis.
The plans include cleaning debris from inside the culvert barrel, and the proposal pays the cleaning and the disposal of excess material in one item. No document says what the culvert contains or how much there is, so the cleaning effort and the haul cannot be priced from the bid set. A question to WisDOT about the expected debris would settle it for all bidders.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
The USH 53 Galesville to Whitehall project is out for bids until December 8, 2026, with the plans and the proposal public on the WisDOT site. We ran Telamont on that public package to see what bidders will be working with. A few points are worth raising with WisDOT before bids close, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.