We found 25 risks in your Fort Pierce tornado repairs documents.

Here are 3 of the 25 risks we found in the public Fort Pierce tornado repairs package, each with the clause and page it comes from.
Fort Pierce tornado repairs
What we found in the
Fort Pierce tornado repairs
documents
Finding

Greenhouse exhaust fans are scheduled in aluminum, and the specifications require galvanized steel

Section 13 34 13, article 2.20.1, requires exhaust fans of galvanized steel construction. Sheet M-601 schedules EF-1, EF-2 and EF-3 as aluminum sidewall propeller fans. The two documents name different materials for the same fans, and the answers to bidder questions do not settle it.

Specifications, p. 216 · Drawing set part 4, M-601, p. 6
Finding

Fertilizer solution reservoirs must be drained before demolition, with no volume or disposal requirements given

The hazardous material survey of the horticultural lab identifies fertilizer solution reservoirs and says they should be drained and relocated or recycled before demolition or renovation. It also states that testing of the suspect materials was excluded from the assessment. The documents give no volume, chemical inventory or receiving facility, so the handling and disposal cannot be sized before demolition.

Horticultural Research Lab Hazardous Material Survey, p. 14 · p. 8
Finding

Picos Farm double doors are scheduled at 7'-0" high, and the specifications call for 6'-8"

Section 13 34 13, article 2.19, describes double doors at 6'-0" wide by 6'-8" high. The door schedule on sheet A601 for Picos Farm lists door 202 at 6'-0" by 7'-0". The two documents give different heights, so the door order and the frame openings depend on which one governs.

Specifications, p. 216 · Drawing set part 3, A601, p. 9
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The Fort Pierce rebuild runs in phases around live research, with two weeks between phases to move plants. We ran Telamont on the public package, the drawings, the specifications, the surveys and the answers to bidder questions, to see where a question could hold up the next phase. A few items are worth settling with USDA early, and I would be glad to walk your team through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo