This page was made for your team.
Share it with a colleague
Telamont
Langlas & Associates

We found 28 risks in your Pryor Clinic documents.

Here are 3 of the 28 risks we found in the public Pryor Clinic package, each with the clause and page it comes from.
Pryor Clinic
What we found in the
Pryor Clinic
documents
Finding

Access control drawings assume two different existing systems, NAPCO and Andover

Sheet AC-1 assumes the existing card access control is a NAPCO-Alarm Lock network with PDL6100 locks, while sheet AC-2 assumes an Andover system. The scope requires complete compatibility, programming, licensing and reporting with the existing system, so the interfaces and licenses cannot be priced until one system is identified.

Drawings, sheets AC-1 (p. 73) and AC-2 (p. 74)
Finding

Elevator pit excavation depends on the existing groundwater system, with no extent for the adjustment or dewatering

The geotechnical report says the existing clinic's groundwater measures must be evaluated and adjusted for the new lowest bearing elevation at the elevator pit slab, and that the contractor should be prepared to perform construction dewatering. The documents give no description of the existing system, no extent and no quantity, so the work cannot be priced from the package.

Geotechnical report, p. 12
Finding

Waterproofing isolation membrane cites ASTM D5109, a withdrawn standard

Section 09 30 13 requires the waterproofing isolation membrane to comply with ASTM D5109, Type II, Grade I. That standard has been withdrawn, so a product cannot be certified against it as written, and the submittal needs a current standard agreed with the designer.

Specifications, Section 09 30 13, paragraph 2.5.F, p. 346
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The Pryor clinic renovation is a federal health job with its own clauses, a geotechnical report and a full set of specifications and drawings. We ran Telamont on the public IHS package to see what your team will be working with as the job moves forward. A few items are worth settling with IHS early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo