Traffic Control Detail D1 gives the existing bridge width as 28.4 feet, while structural sheet S-1.05 shows the existing San Pedro Bridge as 28'-10" wide. The demolition limits, temporary barriers and traffic opening depend on which width governs.
Plans page 23 requires 25 mil wet paint after the final pavement surface course, while the pavement marking notes on page 35 require 15 mil wet paint at the same stage. The thickness to price and apply depends on which one governs.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
The San Pedro River bridge on SR 82 is a long job, with 500 working days and a package that mixes plans, special provisions and soil reports. We ran Telamont on the public documents to see where they disagree. If a few items are worth settling with ADOT early, I would be glad to walk your team through them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.