This page was made for your team.
Share it with a colleague
Telamont
KE&G Construction

We found 11 risks in your SR 82 San Pedro River Bridge documents.

Here are 2 of the 11 risks we found in the public SR 82 San Pedro River Bridge package, each with the clause and page it comes from.
SR 82 San Pedro River Bridge
What we found in the
SR 82 San Pedro River Bridge
documents
Finding

Existing bridge width: 28.4 feet in the traffic control detail, 28'-10" on the structural sheet

Traffic Control Detail D1 gives the existing bridge width as 28.4 feet, while structural sheet S-1.05 shows the existing San Pedro Bridge as 28'-10" wide. The demolition limits, temporary barriers and traffic opening depend on which width governs.

Traffic Control Detail D1, p. 42 · Structural sheet S-1.05, p. 43
Finding

Final pavement markings: 25 mils in the traffic notes, 15 mils in the pavement marking notes

Plans page 23 requires 25 mil wet paint after the final pavement surface course, while the pavement marking notes on page 35 require 15 mil wet paint at the same stage. The thickness to price and apply depends on which one governs.

Plans, traffic notes, p. 23 · Pavement marking notes, p. 35
Finding

Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The San Pedro River bridge on SR 82 is a long job, with 500 working days and a package that mixes plans, special provisions and soil reports. We ran Telamont on the public documents to see where they disagree. If a few items are worth settling with ADOT early, I would be glad to walk your team through them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo