The Crosshole Sonic Logging special provision sets tube count and spacing from Table 04-1, whose first range is 4.0 to 5.0 feet. Plan sheets 586 and 588 schedule 24-inch and 30-inch drilled shafts. The table gives no tube count or spacing for those diameters.
Addendum 7, answer A76, says the 11/1/2030 note will be removed in a forthcoming addendum. The conformed plans, issued after the award, still state it. The critical path schedule has no single controlling interim date.
The lighting notes require the contractor to remove the existing temporary lighting system between IR 75 STA 472+00 and 486+00, and state that it is not shown on the plans. Bid item 625E98200 pays the removal as one lump sum. Equipment and extent are not documented.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the I-75 widening award in Cincinnati. With five years of work ahead, we ran Telamont on the public ODOT package to see what your team will be working with. A few items are worth settling with ODOT early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.