Sheet A-102 requires the contractor to survey the existing concrete floor and install the repairs needed to receive the floor leveler for the mobile racking system. The documents give no existing flatness, levelness, cracking or repair quantity, so the repair and leveling work cannot be sized before the survey.
Section 23 30 00, paragraph 2.10.6, requires bird screens in ASTM E2016 No. 2 mesh, aluminum or stainless steel. Sheet M-103 calls for a 3/4-inch bird screen. The screen to order depends on which one governs.
Sheet E-602 bases the existing panel data on available information and leaves the short-circuit rating of Panel A empty. It asks the contractor to verify the rating in the field before purchasing the new circuit breakers, so their interrupting rating cannot be set from the documents.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Building 47 at NUWC Newport puts existing conditions, a fire protection system and dust collection shop drawings in one package. We ran Telamont on the public package to see what your team will be working with. A few items are worth settling with NAVFAC early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.