The addendum lists 18-inch reinforced-concrete pipe under Item 464 as Class IV. Sheet 270 calls for an 18-inch RCP culvert as Class III at the eastbound culvert at station 3156+00. The documents do not say which class governs the order and the acceptance.
Sheet 219 schedules the crash cushion foundation as 4.5-inch asphalt. Standard sheet 230 requires either 6 inches of asphalt over 6 inches of subbase (Type C) or an 8-inch asphalt-only foundation (Type D).
The sheet summary lists 2,119 LF of construction perimeter fence. Three plan callouts give separate quantities of 530 LF, 1,407 LF and 712 LF that do not reconcile to the summary.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Loop 195 between FM 3167 and FM 649 is a new road with years of work ahead. We ran Telamont on the public TxDOT package to see what your team will be working with. A few points are worth settling with TxDOT early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.