The solicitation form says to begin performance within 15 calendar days and complete within 1,095 calendar days after notice to proceed. Special Requirement 1 says to commence within 10 calendar days and complete not later than 1,460 days after notice to proceed. The two clocks give different start dates and almost a year of difference in completion, so the schedule and the general conditions price depend on which one governs. That is a question for the National Park Service before bids close.
Section 5.4 of the Inner Canyon geotechnical report takes a 0.23g peak ground acceleration with ASCE 7-22 and Site Class D, while section 5.6 recommends Site Classification B for seismic design at the Roaring Springs Pumphouse and Cottonwood Campground sites. The two classes lead to different seismic loads for the structures and retaining walls. Which one governs is worth settling with the National Park Service before pricing.
Volume A, section 01 27 00 describes the two directionally drilled bores with approximately 160 LF of 20-inch conductor casing and approximately 3,000 LF of 13 3/8-inch surface casing. The geotechnical summary report describes each bore with an 80-foot conductor casing and 1,350 feet of 13 3/8-inch casing. Whether the specification quantity is per bore or for both bores changes the casing to price, so it is worth confirming with the National Park Service.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
The North Rim and Roaring Springs rehabilitation program is out for bids until January 8, 2027, with 52 public documents between the specifications, drawings and geotechnical reports. We ran Telamont on that public package to see what bidders will be working with. A few points are worth raising with the National Park Service before bids close, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.