Section 01 45 00 requires a Contractor Quality Control System Manager on site at all times, employed by the general contractor, but leaves the minimum years of related experience to be determined by the project manager or resident engineer. The staffing profile cannot be fixed until the VA states the number.
Section 01 57 19 requires temporary or permanent sediment basins sized for a local design-year storm and leaves the storm value blank. The basin capacity and the related erosion controls cannot be sized or priced from the specification.
One section requires the schedule to carry at least 20 work days for VA submittal approval, another sets the review at 15 business days, and Attachment 2 gives the VA 7 calendar days for the final construction documents. A single approval period cannot be built into the procurement and submittal schedule.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
The Martinez parking structure puts your team on the design side of a VA contract, on a campus that stays open while you build. We ran Telamont on the public package to see what the design has to meet. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.