Sheet G111.2 requires each area to be under negative pressure at 0.02 inches WC and, in the sentence before, to maintain 0.02 inches HG. Sheet G100.2 gives 0.01 inches of water gauge. The pressure the machines are sized and monitored for is not settled.
Sheet P001.2 gives the fire flow data as placeholders for the test date, static pressure, residual pressure and flow, then asks the contractor to verify the data with an NFPA 291 flow test. The water supply the sprinkler design relies on is not stated.
Section 262416 lists several panelboard manufacturers, then requires the same manufacturer as the existing facility equipment, from a single supplier. The drawings show the existing panel from record drawings and ask the contractor to verify all circuits in the field. The manufacturer to match and the circuits in use are not stated.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
The Crow Phase II renovation comes with a 534-page project manual and 86 pages of drawings. We ran Telamont on the public package to see where the specifications, drawings and amendments still leave questions open. A few items are worth settling with the Indian Health Service early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.