We found 53 risks in your FAA HQB Upgrades documents.

Here are 3 of the 53 risks we found in the public FAA HQB Upgrades package, each with the clause and page it comes from.
FAA HQB Upgrades
What we found in the
FAA HQB Upgrades
documents
Finding

The new generator adds 3,345 CFH to an existing 2-inch gas line, and the capacity of the existing service is not documented

The plans connect the new generator piping to the existing gas service and state an additional generator load of 3,345 CFH on an existing 2-inch line with existing regulators. No document gives the capacity of the existing meter, regulator or line, so nobody can tell whether they carry the generator, and an upstream upgrade could land on the contractor.

Plans, p. 112 · p. 113
Finding

Telecom rooms B18A and 338 must stay powered and cooled throughout construction, and no source, load or cooling capacity is given

The electrical drawings require the contractor to coordinate and provide temporary power and HVAC so telecom room B18A and telecom storage room 338 stay powered and cooled in every phase. The drawings give no source, load or cooling capacity for these rooms, so the temporary systems cannot be sized or priced.

Electrical drawings, p. 177 · p. 183
Finding

The new emergency radio system must be compatible with the existing Honeywell Fiplex system, and its existing configuration is not documented

Section 27 53 19 requires the new system to be compatible with the existing Honeywell Fiplex system and asks for signal calculations for the buildings. The documents give no data on the existing Fiplex configuration, so the interface equipment, the fiber work and the signal conditioning cannot be sized.

Section 27 53 19, p. 689 · p. 691
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The HQB mechanical and electrical upgrade keeps your team inside an occupied FAA building until 2029. We ran Telamont on the public package to see what your crews will be working with as the FAA issues revisions during construction. A few items are worth settling with the FAA early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo