We found 5 risks in the US 287 Potter County intersection bid documents.

Each one could be worth a question to TxDOT before the letting on December 2, 2026. Here are 3, with the clause and page.
US 287 Potter County intersection
What we found in the
US 287 Potter County intersection
documents
Finding

The erosion-control log stakes are detailed as wood or #3 rebar, while the proposal allows wooden stakes only

The proposal directs the contractor to use wooden stakes for erosion control logs and prohibits rebar stakes, while the erosion-control detail on the plans shows #3 rebar embedded as an option. Stakes bought from the detail would not meet the proposal. Which document governs is worth asking TxDOT before the letting.

Proposal p. 17 and plans detail p. 236
Finding

The Spur 228 cross culvert is at Sta. 28+32 on Sheet 148 but at Sta. 28+31 in Milestone A

Sheet 148 places the cross culvert at Sta. 28+32, while the Milestone A note in the proposal sets the drainage work at Sta. 28+31. The two stations are one foot apart on the item that is built first under the closure. That is a question to TxDOT before the letting.

Proposal p. 13 and plans Sheet 148
Finding

An existing TxDOT utility is shown only approximately, with no type, route or depth

A plan note tells the contractor to remove the existing TxDOT utility that is immediately affected by the work, and the proposal only asks for advance contact with the signal shop. The type, route and depth of the utility are not given, so the removal and excavation limits depend on a clarification from TxDOT before the letting.

Plans note p. 87 and proposal p. 12
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The US 287 intersection improvements in Potter County go to letting on December 2, 2026. We ran Telamont on the public proposal and plans to see what bidders will be working with. A few differences between documents are worth raising with TxDOT before the letting, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo