This page was made for your team.
Share it with a colleague
Telamont
ForUs Contracting

We found 34 risks in your North Little Rock transformer documents.

Here are 3 of the 34 risks we found in the public North Little Rock transformer package, each with the clause and page it comes from.
North Little Rock transformer
What we found in the
North Little Rock transformer
documents
Finding

Transformer connections call for two conduits and a spare set on each side, while sheet E502 keeps the existing conduit

The M&O Standards require two 4-inch conduits and one matching spare set on both the primary and secondary sides of each transformer, with spares capped and labeled. Sheet E502 states that existing conduit remains and does not show the conduit and spare-set installation. The conduit work to price depends on which one governs.

M&O Standards, p. 6 · Drawings, sheet E502, p. 10
Finding

PCB transformers must be handled under EPA rules, and the documents do not identify which transformers contain PCBs

Section 01 00 00 requires PCB transformers and capacitors to be taken out of service and handled under EPA and DOT procedures, and the statement of work requires one-for-one replacement of existing utility grade transformers across the campus. The documents do not identify which units contain PCBs, how many there are or where they are, so the handling and disposal cannot be sized.

Specifications, Section 01 00 00, p. 17 · Statement of work, p. 2
Finding

Pad-mounted transformers name Envirotemp FR3 in one place and mineral oil in another

Section 26 12 19 lists the loop feed option with Envirotemp FR3 insulating liquid, while paragraph 2.9 C requires mineral oil to ASTM D 3487. The liquid to order, and its price, depend on which one governs.

Specifications, Section 26 12 19, pp. 342 and 344
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The North Little Rock feeder and transformer job comes with 376 pages of specifications, six electrical sheets and the VA's M&O standards. We ran Telamont on the public package to see where they still disagree. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo