Section 08 51 13 requires the impact-resistant insulating glass unit to use a clear laminated interior lite. The Section 08 80 00 schedule lists the G-1 indoor lite as clear annealed float glass. A bid priced on one construction can be held to the other, and laminated is the costlier one. Which governs is worth settling with the FAA before bids close.
Sheet S-101 marks the footings and piers as preliminary and for bidding only. Final sizes follow the metal building information, so the excavation, concrete, reinforcement and forming quantities cannot be fixed from the bid set. Asking the FAA when final sizes will be issued is worth doing before bids close.
The geotechnical report says unstable soils should be overexcavated and replaced with an approved low volume change soil, and that the amount cannot be determined at this time. The excavation, disposal, replacement fill and compaction have no quantity to price. A question to the FAA about an allowance or a unit price would give every bidder the same basis.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
The MMAC Industrial Waste Water Treatment Plant Upgrades are out for bids until November 30, 2026, with 15 public documents between the specifications, drawings and geotechnical report. We ran Telamont on that public package to see what bidders will be working with. A few points are worth raising with the FAA before bids close, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.