We found 37 risks in your CMS Roofs and Elevators documents.

Here are 3 of the 37 risks we found in the public CMS Roofs and Elevators package, each with the clause and page it comes from.
CMS Roofs and Elevators
What we found in the
CMS Roofs and Elevators
documents
Finding

Roof hot work fire watch is 3 hours in one section and 24 hours in another

The Division 1 work restrictions require the fire watch to extend at least 3 hours after roof hot work, while the hot work fire prevention section requires a continuous fire watch at least 24 hours after burning work, so the watch period to price and staff depends on which one governs.

Division 1 specifications, Work Restrictions p. 77 and Fire Prevention Precautions for Hot Work p. 159
Finding

Removed hydraulic elevator equipment is Contractor property in one paragraph and GSA property in the next

Section 3.1.B of the hydraulic elevator specification says removed equipment becomes the property of the Contractor, who must take it off site, while the paragraph that follows keeps all removed components as GSA property until GSA says in writing what it wants to retain, so disposal, storage and handling cannot be priced consistently.

Hydraulic elevator specification 14 24 00, Section 3.1.B and its paragraph 2, p. 21
Finding

New roof drains are required at every primary and overflow location, but no drain schedule gives the count

Section 6.5 of the program of requirements requires new drains at every primary and overflow location, with plumbing adjusted to suit. Appendix I lists roof locations, roof types and cores but no drain schedule, so the number of drain bodies and the plumbing work cannot be priced from the package.

Roof Replacement Program of Requirements, Section 6.5, p. 19
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The CMS roofs and elevators job puts your team on the design side of a GSA contract, with roofs and elevators across the whole Woodlawn campus. We ran Telamont on the public package to see what the design has to meet. A few items are worth settling with GSA early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo