We found 9 risks in your Route 99 Madera documents.

Here are 3 of the 9 risks we found in the public Route 99 Madera package, each with the clause and page it comes from.
Route 99 Madera
What we found in the
Route 99 Madera
documents
Finding

Crossover 2 removal starts at station 403+50 in the sketch and 403+75 in the quantity table

Sheet SC-147, reissued in Addendum 9, shows Crossover 2 removal from station 403+50 to 409+00. Its quantity table measures the same removal from 403+75 to 409+00, with 444.4 SQYD and 75.0 TON. The 25 feet in between change the area removed and the quantities, so the limit to follow is worth confirming with Caltrans.

Addendum 9 plan sheet SC-147, p. 2
Finding

City street lane chart M2 is for Avenue 12 but its closure limits are Avenue 9

Addendum 5 replaces section 12-4.02C(3)(m). Chart M2 gives the location as Madera 99, Avenue 12, postmile R7.42, yet its closure limits read Avenue 9, postmile R3.54, the same as Chart M1. No later addendum reissues the chart, so the limits for closures at Avenue 12 are worth confirming with Caltrans before traffic control is priced.

Addendum 5, section 12-4.02C(3)(m), Chart M2, p. 4
Finding

The railroad decides the flagging, and a short flagging crew is charged to you as delay costs

The railroad representative makes the final decision on flagging needs from the description of your work in the notification. If too few flagging personnel are scheduled because that description does not match actual field operations, you are responsible for your delay costs. The flagging crew therefore depends on how closely the notification matches the field work.

Special Provisions, railroad requirements, p. 36
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Congratulations on the Route 99 Madera award. Before your crews mobilize, we ran Telamont on the public package to see what your team will be working with. A few items are worth settling with Caltrans early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo