We found 20 risks in your Big Spring boiler plant documents.

Here are 3 of the 20 risks we found in the public Big Spring boiler plant package, each with the clause and page it comes from.
Big Spring boiler plant
What we found in the
Big Spring boiler plant
documents
Finding

The objective calls for water tube steam boilers, while the base bid calls for fire tube boiler packages

Section 1.3.2 states the objective of three dual-fuel water tube steam boilers, while Section 5.1.3 requires new fire tube boiler packages in the base bid. The boiler product to price depends on which requirement governs.

Attachment 1, Section 5.1.3, p. 20
Finding

Concealed materials around the boilers must be treated as asbestos, with no extent given

The 2016 asbestos survey of Building 2 treats unidentified materials in chases, walls, ceilings, crawlspaces and boiler cavities as assumed asbestos until sampled, and defers further assessment until renovation exposes them. The survey gives no quantity or mapped extent for these areas, so the abatement they may require cannot be sized before demolition.

Asbestos Survey Report, September 2016, Building 2, p. 4
Finding

Lead-paint removal points to Section 02 83 33.13, which is not in the specifications

The specifications send lead-paint removal to Section 02 83 33.13, Lead-Based Paint Removal and Disposal, and list lead abatement among the required activity hazard analyses. That section does not appear in the specification volume. The 2016 lead-based paint inspection found eleven lead-paint components in Building 2, and the requirements for handling them are not written in the documents.

Specifications, p. 446 · Activity hazard analysis list, p. 80
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Congratulations on the Big Spring boiler plant award. Before your crews start in Building 2, we ran Telamont on the public package to see what your team will be working with. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont