This page was made for your team.
Share it with a colleague
Telamont
Covington Contracting

We found 57 risks in your Building 6403 documents.

Here are 3 of the 57 risks we found in the public Building 6403 package, each with the clause and page it comes from.
Building 6403
What we found in the
Building 6403
documents
Finding

Chillers are scheduled with R454B refrigerant, and Section 23 64 00 requires a refrigerant with flammability rating 1

Schedule M-702 lists chillers CHLR-1 and CHLR-2 with refrigerant R454B. Section 23 64 00 requires chillers designed and selected with a refrigerant of flammability rating 1 under ANSI/ASHRAE Standard 34. The two documents point to different refrigerants, so the units ordered from the schedule can fail the specification at acceptance.

Schedule M-702, p. 2 · Section 23 64 00, p. 22
Finding

Electrical panels have unknown connected loads and are marked overloaded while new equipment circuits are added

The revised electrical schedules state that panelboard connected and demand loads are unknown and that the loads shown are engineer estimates only. They also mark a panel as overloaded. New equipment circuits are still added to these panels, so panel or feeder changes cannot be priced and nobody can confirm that the new circuits fit.

Revised electrical schedules, p. 82
Finding

The mechanical schedule marks isolators for the air-handling units as not required, and Section 23 82 00 requires spring isolators

Schedule M-702 marks the vibration isolators as NR, not required. Section 23 82 00 requires spring type unit mounting vibration isolators, provided by the unit manufacturer. Units priced from the schedule arrive without isolators, and the gap shows up at acceptance.

Schedule M-702, p. 54 · Section 23 82 00, p. 45
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The Building 6403 renovation at Moore Air Base has a lot packed into it: labs, growth chambers, greenhouses and a full mechanical, electrical and plumbing upgrade. We ran Telamont on the public package to see where a question could slow the work. A few items are worth settling with APHIS early, and I would be glad to walk your team through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo