This page was made for your team.
Share it with a colleague
Telamont
Classic Site Solutions

We found 27 risks in your Route 209 documents.

Here are 3 of the 27 risks we found in the public Route 209 package, each with the clause and page it comes from.
Route 209
What we found in the
Route 209
documents
Finding

Boardwalk foundations: the contractor runs the subsurface investigation and finalizes the piles

Section 03 41 40 requires the contractor to hire a Pennsylvania-licensed geotechnical engineer, run a supplemental subsurface investigation and finalize the pile type, size and length. The pile information on the drawings is stated to be for bidding purposes only (p. 158), so the investigation and the resulting foundation cannot be priced from the documents.

Specifications, Section 03 41 40, pp. 156 and 158
Finding

Tack coat on milled surfaces: 0.07 to 0.10 gallons in one section, 0.75 to 1.0 in another

Section 32 01 17.71 sets the tack coat on milled surfaces at 0.07 to 0.10 gallons per square yard, while Section 32 12 13.13 sets 0.75 to 1.0 gallons for milled surfaces. That is about ten times the material, and the Contracting Officer approves the exact rate, so the paving price depends on which section is applied.

Specifications, Sections 32 01 17.71 and 32 12 13.13, pp. 319 and 338
Finding

Tree clearing is barred from April 1 to November 15 in one note and allowed from September 30 in another

General note 6 prohibits clearing trees 3 inches DBH or greater project wide from April 1 to November 15. The erosion and sediment sequence says trees greater than 3 inches DBH may be cleared from September 30 to April 1. The two overlap from September 30 to November 15, and the clearing of the drainage repair areas depends on which one applies.

Bid drawings (Addendum 3 set), general notes and erosion and sediment sequence, pp. 12 and 13
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Congratulations on the Route 209 award. Before your crews mobilize, we ran Telamont on the public solicitation package to see what your team will be working with. A few items are worth settling with the Park Service early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo