The hydraulic data on sheet 186 gives existing-condition flows of 1,165.61 cfs (10-year) and 2,713.63 cfs (100-year) for Culvert 23. The culvert schedule on sheet 199 gives 2,279.72 and 3,792.11 cfs for the same culvert. The plans do not say which discharge governs the sizing and the acceptance of the work.
The hydraulic data on sheet 187 gives existing-condition flows of 213.97 cfs (10-year) and 811.44 cfs (100-year) for Culvert 24. The culvert schedule on sheet 199 gives 611.80 and 1,343.61 cfs for the same culvert, a much higher discharge for the same box culvert.
The hydraulic data on sheet 188 gives existing-condition flows of 79.24 cfs (10-year) and 118.18 cfs (100-year) for Culvert 26. The culvert schedule on sheet 199 gives 148.91 and 221.42 cfs for the same culvert, nearly double.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the FM 791 award in Karnes County. We ran Telamont on the public TxDOT plans and proposal to see what your crews will be working with. A few points are worth settling with TxDOT early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.