We found 10 risks in your Bay Bridge fender documents.

Here are 3 of the 10 risks we found in the public Bay Bridge fender package of the CEC / Golden State Bridge JV, each with the clause and page it comes from.
Bay Bridge fender
What we found in the
Bay Bridge fender
documents
Finding

Rubber fender testing is required on every unit in one section and on 10 percent of the units in another

Section 78-6.01C(6)(b)(ii) asks for deflection test data for each rubber fender unit used in the project. Section 78-6.01D(3)(b)(ii) limits verification testing to 10 percent of the units, with an equal number at each pier. The two sections give different test quantities.

Special provisions as revised by Addendum 5, section 78-6.01C(6)(b)(ii), p. 8 · section 78-6.01D(3)(b)(ii), p. 9
Finding

Tidal and current variations are not paid, and the contractor must determine the actual mean tide data

Section 5-1.51 warns of severe tidal fluctuation, strong currents and limited slack-water periods, tells the contractor to determine the actual mean tide data, and states that the Department does not pay for variations in tidal or current conditions. The section gives no slack-water windows. Marine duration and standby are priced without them.

Special provisions, section 5-1.51, p. 23 (replaced by Addendum 3 with the same wording)
Finding

Shipping and handling costs for the FRP panels and walers are left to be determined at the time of shipping

The material tables for the FRP panels (section 78-6.02A(b)) and the FRP walers (section 78-7.02A) list shipping and handling expenses as to be determined at the time of shipping. Delivery of both systems has no stated basis in the documents.

Special provisions as revised by Addendum 5, section 78-6.02A(b), p. 14 · section 78-7.02A, p. 19
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Congratulations to your team on the CEC / Golden State Bridge JV award for the Bay Bridge fender replacement. Before work starts on the water, we ran Telamont on the public Caltrans package to see what the JV will be working with. A few items are worth settling with Caltrans early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo