Section 23 07 90 requires exhaust flexible connections to be covered with an insulating blanket. Section 26 32 13 says insulation and jacket are not required on flexible exhaust sections. The generator exhaust can be priced two ways, and the owner's reviewer may enforce the more demanding one.
The door schedule on sheet AE601 lists overhead door 101B with a 1 HOUR fire rating. Section 08 33 00 requires coiling doors with a 1-1/2 hour rating (ASTM E119). A door ordered to the schedule can fail acceptance and need reordering.
Sheet CU104 calls for a 30' horizontal slide gate with 2-Step authentication. Sheet CG111 calls for a 30' control arm gate with the same authentication note. The documents do not say whether these are two gates or one, and the two assemblies are priced very differently.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the VA Water Storage Facility award. Before your crews mobilize, we ran Telamont on the public package to see what your team will be working with. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.