We found 20 risks in your Gainesville IR Suites documents.

Here are 3 of the 20 risks we found in the public Gainesville IR Suites package, each with the clause and page it comes from.
Gainesville IR Suites
What we found in the
Gainesville IR Suites
documents
Finding

The first-floor level is 100'-0" on sheet A101, 110'-0" on a section and 105'-0" on the structural plan

Architectural sheet A101 sets the first floor at 100'-0", equal to 728'-0", while section A301 shows the first floor at 110'-0" and structural sheet S101 shows the existing slab top at 105'-0". The first-floor slab, equipment and finish levels cannot be set out until the datum is clarified.

Architectural section A301 and structural plan S101, pp. 9 and 19
Finding

Lead-lined doors must match 1/16 inch lead protection in one section, while the lead-lined drywall basis of design is 1/6 inch

Section 08 14 00 requires lead-lined doors to match the radiation protection of adjacent partitions, described as 1/16-inch lead-lined gypsum wallboard, while Section 13 49 00 names lead-lined drywall with 1/6-inch lead lining as the basis of design. The lead thickness for the doors and partitions cannot be priced until one value is confirmed.

Specifications, Sections 08 14 00 and 13 49 00, p. 573
Finding

The sprinkler design is based on a fire pump test that does not exist yet, with no flow or pressure values given

Section 21 13 13 requires modifying the existing first-floor sprinkler system and bases the water supply on a flow test of the existing Building 1 fire pump, which the fire sprinkler contractor must provide. No flow or pressure values are given, so pipe sizing, hydraulic capacity and any corrective work cannot be priced from the package.

Specifications, Section 21 13 13, p. 580
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The interventional radiology suites at Malcom Randall are the kind of occupied-hospital work your team has built its name on. We ran Telamont on the public Gainesville package, 1,131 pages of specs and 136 drawing sheets, to see what your crews will be working with over the next two years. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo