The drainage plan locates the P-OUT at STA 1009+37.00, while the profile locates the same 36-inch RCP outfall at STA 1009+40. The documents do not say which station governs the set-out and the tie-in of the pipe.
The traffic-control plan requires a temporary connection to maintain positive drainage, while the pipe specification says connections to existing or proposed boxes or pipe are not paid directly. The documents give no size, capacity, route or material for the temporary connection.
The ITS layout requires 29 Ethernet switches in existing device ITS cabinets, and the specification requires work inside existing enclosures. The documents give no space, power capacity or condition for those cabinets.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the SL 121 award in Bell County. We ran Telamont on the public TxDOT proposal and plans to see what your team will be working with. A few items are worth settling with the Waco District early, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.