This page was made for your team.
Share it with a colleague
Telamont
Benaka

We found 21 risks in your F-16 Mission Training Center documents.

Here are 3 of the 21 risks we found in the public F-16 Mission Training Center package, each with the clause and page it comes from.
F-16 Mission Training Center
What we found in the
F-16 Mission Training Center
documents
Finding

Lavatory P-5 is scheduled as a stainless steel undermount, while Section 22 00 00 requires white vitreous china, self-rimming

Section 22 00 00, paragraph 2.4.5, requires countertop lavatories to be white vitreous china and self-rimming, at least 19 by 17 inches. Sheet P-701 schedules P-5 as a 17-1/2 by 12-1/2 inch ADA undermount stainless steel lavatory. The product to order depends on which one governs.

Specifications, Section 22 00 00, p. 80 · Drawings, sheet P-701, p. 18
Finding

The RFI names an existing Automated Logic control system, while the specification says the base has none and mentions Metasys

The RFI responses require the DDC system to integrate with the existing Automated Logic system. The specification says the base has no base-wide facility management control system, and that a couple of buildings use a Metasys system by Johnson Controls. The interface and gateway work cannot be sized against two different systems.

Project specifications, p. 460 · RFI responses
Finding

South parking option: 77 spaces in the solicitation, 64 spaces in the technical scope

Section 00 10 00 describes the second option as South Parking, 77 new spaces, while document 00 22 13.00 20 describes the south parking area as 64 spaces. The paving and striping quantity for the option depends on which one governs.

Project specifications, p. 16 · Section 00 10 00
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

Book a 30-minute demo on the F-16 Mission Training Center package. It is already set up, so there is nothing to prepare: we go through every risk with the page it comes from, and the ones worth raising with the Guard now.

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Congratulations on the F-16 Mission Training Center award. Before your crews mobilize at the 177th, we ran Telamont on the public package to see what your team will be working with. A few items are worth settling with the Guard early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo