Two roadway plan sheets give different end stations for the same Special Base Ditch Detail D, which starts at station 82+73. The 86+00 limit is the longer one, so the ditch length, the grading quantity and the pay limits depend on which sheet governs.
The steel price provision requires the completed Form SPA-1 within 14 calendar days after the notice of award, in the same submittal as the bonds and the execution sheets. If it is missing from that submittal, no item in the contract is eligible for a steel price adjustment.
Intermediate Contract Time Number 3 starts on the day the contractor elects to begin Phase I, Steps 2A and 2B on sheet TMP-3, and ends 14 consecutive calendar days after and including that date. Each day beyond costs 250 USD and the clause states no maximum.





Of rework avoided on one customer project, after a conflict was caught before execution.
Of document review saved per project, reported by a customer.
Typical return on the platform. One avoided issue usually pays for it.
Congratulations on the US 17 award in Martin County. We ran Telamont on the public NCDOT plans and proposal to see what your team will be working with. A few points are worth settling with NCDOT before grading starts, and I would be glad to walk you through all of them.


Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.
Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.
Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.
Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

